Home > Architecture > References >
CMP composite panels were used for the grid-free installation of ceiling elements made of gold-anodized aluminum mesh for the King of England project.
Within the scope of refurbishing the historic building in Stuttgart, which is today home to the Baden-WĂĽrttemberg Finance Ministry, the top floor of the building was upgraded with ceiling elements made of gold-anodized aluminum mesh. For the first time, the CMP-Alu6010 composite mesh panel was used for the suspended ceiling. This allows for a butt-jointed installation over a large area.
Get in touch with our architectural mesh experts:
Project name: King of England
Location: Stuttgart, Germany
Architect: ZSP